Project and installation of all the furniture for the hotel bedrooms

Concept:

Project: Project and installation of all the furniture for the hotel bedrooms and G8 Summit Conference Room

Solution: The first phase of the project required a survey of all the parts that need to be covered by means of a 3D laser scanner and projection of a 3D shell on which the final project will be developed.
The second phase is dedicated to the creation and development of possible constructive solutions while keeping to the architect’s concept and then verifying (FEM) all hypothetical construction solutions.
The third phase is dedicated to preparing a 3D model of all its parts and preparation of all the technical documents for the suppliers to produce the components.
The fourth phase is dedicated to the construction site mangers during the assembly of all the parts